Prefi®
Prefi Prefabricated Camp Site Buildings Inc.
Your dedicated "Accomodational Camp Site Turn-key Builder" in even  desert or extreme tundra conditions

 

 

Man Camps

>     30 man Camp

>     50 man Camp

>   100 man Camp

>   150 man Camp

>   200 man Camp

>   250 man Camp

>   500 man Camp

> 5000 man Camp

_____________

 

Camp Buildings

> Dining Halls

> Offices

> Dorm's

> Dorm's (wWC)

> Warehouses

> Mobile Units

> Tents

> Bonus: P.Details

_____________

 

Technical Specs

> -40/+0

> -20/+20

> -10/+30

> -40/+40

> +0/+55

> +10/+40

> Panel. Details

> Panel Details

_____________

 

Using and Mounting

> Main Structure

> S. Ceiling

> Electrical Items

> Sanitary Items

_____________

 

Camp References

>  ARTEK Const

>  BAYTUR Const

>  Beta Offices

>  BM Holdings

>  GES Energy

>  Gordion Group

>  Ilcı Const

>  MNG Libya Camp

>  Nurol-Cengiz C.

>  Tr Military

> YM Railway

>  YUKSEL Const

_____________

 

Certificates

> TSE-ISO-EN9000

> TSE-ISO-EN9000

> GOST-R

> TUCSA

> Contact

> All

> TTMD

> ASO

____________

 

Mounting Ctlgs

> Buildings

> Simple Tents

____________

 

Where is Prefi Google Earth Link for Prefi

 
> Privacy
> Comments
> Contact

 
  Back to Main Pages

DOGUS CONSTRUCTION  

Several Dam Projects

______________________________________________________________________________________________________

 

  Dogus Construction is one of the key companies of its sector due to its mega project perspective and its superstructure and infrastructure projects undertaken both in Turkey and in the international market. Doğuş Construction, who ranks among the most reputable construction companies since its establishment in 1950, has completed 165 projects amounting to the value of more than USD 9 billion up to this day.

 

  Boyabat Dam and HEPP will be constructed as a concrete gravity dam on the Kızılırmak River by Doğuş Construction with the purpose of energy generation. Power generation of the dam which has the installed capacity of 513 MW and with the height of 195 m starting from foundation, crest length of 262 m, is planned as 1,5 billion Kwh/year. Artvin Dam and HEPP will be constructed as a arch concrete gravity dam on the Çoruh River by Doğuş Construction with the purpose of energy generation. Power generation of the dam which has the installed capacity of 340 MW and with the height of 180 m starting from foundation, crest length of 278 m, is planned as 1 billion Kwh/year.

 

 

 

 

 

 

 

 

 

 

 

Camp Views

Prefi Dogus Construction UDDA Boyabat Dam Project
 Prefi Dogus Construction UDDA Boyabat Dam Project

Prefi Dogus Construction UDDA Boyabat Dam Project

Prefi Dogus Construction UDDA Boyabat Dam Project

Prefi Dogus Construction UDDA Boyabat Dam Project

 

Technical Specs
Technical Details Technical Details Technical Details Technical Details        

Two Floorey Buildings

 One Floorey Buildings Warehouses Mobile Units        
Plans 2d and 3d
           

Office Building I

Office Building II

 

 

       
     

 

   
Contracts
TSE-ISO-EN 9001:2000QM              
TSE-ISO-EN